1 建筑部分
1.1 Location – Climate – Weather File Access
1.1.1 Run Period
1.1.2 Location
1.1.3 Design Day
1.1.4 Ground Temperature
1.1.5 Ground Reflectances
1.2 Surface Construction Elements
1.2.1 Material: Regular
1.2.2 Material: Regular-R
1.2.3 Material: Air
1.2.4 Material: WindowGlass
1.2.5 Material; WindowGas
1.2.6 Construction
1.3 Thermal Zone Descrīption/Geometry
1.3.1 Zone
1.3.2 Surface Geometry
1.3.3 Surface: HeatTransfer
1.3.4 Surface: HeatTransfer: Sub
1.3.5 WindowFrameAndDivider
2 模拟部分
2.1 Simulation Parameters
2.1.1 Building
2.1.2 TimeStep In Hour
2.1.3 Inside Convection Algorithm
2.1.4 Outside Convection Algorithm
2.1.5 Solution Algorithm
2.1.6 Zone Volume Capacitance Multiplier
2.1.7 Run Control
2.2 Schedules
2.2.1 Schedule Type
2.2.2 DaySchedule
2.2.3 DaySchedule: Interval
2.2.4 WeekSchedule
2.2.5 WeekSchedule: Compact
2.2.6 Schedule
2.2.7 Schedule: Compact
3 负荷部分
3.1 Internal Gains
3.1.1 People
3.1.2 Lights
3.1.3 Electric Equipment
3.1.4 Gas Equipment
3.1.5 Hot Water Equipment
3.1.6 Steam Equipment
3.1.7 Other Equipment
3.2 Design Objects
3.2.1 Sizing Parameters
3.2.2 Sizing: Output: Style
3.2.3 Zone Sizing
3.2.4 System Sizing
3.2.5 Plant Sizing
3.3 Set Point Managers
3.3.1 Set Point Manager: Scheduled
3.3.2 Set Point Manager: Scheduled: DualSetPoint
3.3.3 Set Point Manager: Outside Air
3.4 Zone Controls and Thermostats
3.4.1 Zone Control: Humidistat
3.4.2 Zone Control: Thermostatic
3.4.3 Single Heating Setpoint
3.4.4 Single Cooling Setpoint
3.4.5 Single Heating Cooling Setpoint
3.4.6 Dual Setpoint With Deadband
4 冷热源站部分
4.1 Performance Curves
4.1.1 Curve: Biquadratic
4.1.2 Curve: Cubic
4.1.3 Curve: Quadratic
4.1.4 Curve: QuadraticLinear
4.2 Node-Branch Management
4.2.1 Node List
4.2.2 Branch List
4.2.3 Connector List
4.2.4 Branch
4.2.5 Pipe
4.2.6 Pipe: Steam
4.2.7 Duct
4.3 Plant-Condenser Loops
4.3.1 PlantLoop
4.3.2 CondenserLoop
4.3.3 Connection Component: PlantLoop
4.3.4 Connection Component: PlantLoop: Controlled
4.4 Plant-Condenser Control
4.4.1 Plant Operation Schemes
4.4.2 Condenser Operation Schemes
4.4.3 CoolingLoadRangeBased Operation
4.4.4 HeatingLoadRangeBased Operation
4.4.5 Component Setpoint Based Operation
4.4.6 Plant Equipment List
4.4.7 Condenser Equipment List
4.5 Plant-Condenser Flow Control
4.5.1 Splitter
4.5.2 Mixer
4.5.3 Valve: Tempering
4.6 Plant Equipment
4.6.1 Boiler: Simple
4.6.2 Boiler: Steam
4.6.3 Boiler: SPARK: SBoiler
4.6.4 Chiller: Electric
4.6.5 Chiller: Electric: EIR
4.6.6 Chiller: Const COP
4.6.7 Purchased: Chilled Water
4.6.8 Purchased: Hot Water
4.6.9 Thermal Storage: Ice: Simple
4.6.10Thermal Storage: Ice: Detailed
4.7 Water Heaters
4.7.1 Water Heater: Mixed
4.7.2 Heat Pump: Water Heater
4.8 Condenser Equipment
4.8.1 Cooling Tower: Single Speed
4.8.2 Cooling Tower: Two Speed
4.8.3 Cooling Tower: Variable Speed
4.8.4 Cooling Tower: Variable Speed: CoolTools Model Coefficients
4.8.5 Cooling Tower: Variable Speed: YorkCalc Model Coefficients
4.9 Pumps
4.9.1 Pump: Variable Speed
4.9.2 Pump: Constant Speed
4.9.3 Pump: Condensate
4.9.4 Headered Pumps: Simple: Variable Speed
4.9.5 Headered Pumps: Simple: Constant Speed
5 分区设备部分
5.1 Zone Equipment
5.1.1 Controlled Zone Equip Configuration
5.1.2 Zone Equipment List
5.1.3 Air Distribution Unit
5.2 Zone Forced Air Units
5.2.1 Purchased Air
5.2.2 Fan Coil Unit: 4 Pipe
<P class=MsoNormal style="MARGIN: 0cm 0cm 0pt 1cm; TEXT-INDENT: -1cm; TEXT-ALIGN: left; mso-list: l0 level3